3.1.8.1 - Operating Outside of Schedule
Summary
The air handling unit is operating outside the defined occupied schedule.
Root Cause
Schedule is incorrectly implemented - Equipment is placed in manual override
The air handling unit is operating outside the defined occupied schedule.
Schedule is incorrectly implemented - Equipment is placed in manual override